Permit: TC-RES-0425-01759
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
767 W VANOVER RD
Address NEW:
767 W VANOVER RD
Apply Date:
04/04/2025
Applicant:
Sarah McFarland
Description:
Upgrade service to 200 amps
Permit Reviews
Permit Number - TC-RES-0425-01759
Permit Status: Complete
Permit Description: Upgrade service to 200 amps
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/04/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 04/04/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0425-01759
Permit Status: Complete
Permit Description: Upgrade service to 200 amps
| Date | Description | Comments |
|---|---|---|
| 04/04/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0425-01759
Permit Description: Upgrade service to 200 amps
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | BULD - Electrical Clearance | Passed | 7.3.25 Grounding and bonding verified, lugs torqued to spec, address label verified, panel schedule present, all knockouts and unused slots properly covered. Rise is secured. Panel is secured. INCR clearance to TEP. |
|
| 07/03/2025 | COT - RSEL - Electrical Final | Passed | 7.3.25 Grounding and bonding verified, lugs torqued to spec, address label verified, panel schedule present, all knockouts and unused slots properly covered. Rise is secured. Panel is secured. INCR clearance to TEP. |
|
| 07/03/2025 | RSBU - Building Final | Passed | 7.3.25 Grounding and bonding verified, lugs torqued to spec, address label verified, panel schedule present, all knockouts and unused slots properly covered. Rise is secured. Panel is secured. INCR clearance to TEP. |