Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSEL - Electrical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | COT - RSEL - Electrical FinalĀ | Passed | 7.3.25 Grounding and bonding verified, lugs torqued to spec, address label verified, panel schedule present, all knockouts and unused slots properly covered. Rise is secured. Panel is secured. INCR clearance to TEP. |