Permit: TC-RES-0325-01596
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
4937 S CHERRY AV
Address NEW:
4937 S CHERRY AV
Apply Date:
03/27/2025
Applicant:
Luis Borbon Jr
Description:
as-built modification and enclosure
Permit Reviews
Permit Number - TC-RES-0325-01596
Permit Status: Inspections complete
Permit Description: as-built modification and enclosure
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/14/2025 | RESTAMP - RESIDENTIAL v.1 | 10/14/2025 | APPROVED |
| 04/07/2025 | RESIDENTIAL NEW DWELLING v.1 | 05/05/2025 | REQUIRES RESUBMIT |
| 06/03/2025 | RESIDENTIAL NEW DWELLING v.2 | 07/02/2025 | REQUIRES RESUBMIT |
| 09/03/2025 | RESIDENTIAL NEW DWELLING v.4 | 09/03/2025 | REQUIRES RESUBMIT |
| 07/22/2025 | RESIDENTIAL NEW DWELLING v.3 | 08/15/2025 | REQUIRES RESUBMIT |
| 09/16/2025 | RESIDENTIAL NEW DWELLING v.5 | 10/14/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0325-01596
Permit Status: Inspections complete
Permit Description: as-built modification and enclosure
| Date | Description | Comments |
|---|---|---|
| 04/08/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0325-01596
Permit Description: as-built modification and enclosure
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2026 | RSBU - Building Final | Passed | 5/15/2026 Verified per approved plan all prior completed work. All corrections made to prior inspection. |
|
| 05/15/2026 | COT - RSPL - Rough Soil | Passed | 5/15/2026 Verified per approved plan all prior completed work. |
|
| 05/15/2026 | COT - RSPL - Plumbing Final | Passed | 5/15/2026 Verified per approved plan all prior completed work. |
|
| 05/15/2026 | COT - RSME - Mechanical Final | Passed | 5/15/2026 Verified per approved plan all prior completed work. |
|
| 05/15/2026 | COT - RSEL - Electrical Final | Passed | 5/15/2026 Verified per approved plan all prior completed work. Added AFCI breakers to all habitable area circuits, changed AC breaker within manufacturer label for overcurrent protection. |
|
| 05/15/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5/15/2026 Verified per approved plan all prior completed work. |
|
| 05/15/2026 | COT - RSBU - Roof Nailing | Passed | 5/15/2026 Verified per approved plan all prior completed work. Demo interior nonbearing wall in kitchen area, enclosed windows and added nonbearing walls to enclose primary bedroom. |
|
| 05/15/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5/15/2026 Verified per approved plan all prior completed work. |
|
| 05/15/2026 | COT - RSBU - Preslab | Passed | ||
| 05/15/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5/15/2026 Verified per approved plan all prior completed work. Demo interior nonbearing wall in kitchen area, enclosed windows and added nonbearing walls to enclose primary bedroom. |