Permit: TC-RES-0325-01432
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2518 E EASTLAND ST
Address NEW:
2518 E EASTLAND ST
Apply Date:
03/20/2025
Applicant:
TFS Solar
Description:
13.5 kWh storage system (1 Tesla Powerwall-3 battery) with Tesla backup switch connected to existing photovoltaic solar system
Permit Reviews
Permit Number - TC-RES-0325-01432
Permit Status: Complete
Permit Description: 13.5 kWh storage system (1 Tesla Powerwall-3 battery) with Tesla backup switch connected to existing photovoltaic solar system
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2025 | RESIDENTIAL SOLAR v.1 | 04/18/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01432
Permite Description: 13.5 kWh storage system (1 Tesla Powerwall-3 battery) with Tesla backup switch connected to existing photovoltaic solar system
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP pending solar final |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01432
Permit Description: 13.5 kWh storage system (1 Tesla Powerwall-3 battery) with Tesla backup switch connected to existing photovoltaic solar system
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | BULD - Electrical Clearance | Passed | Approved battery addition - BAT Clearance to TEP is required (solar meter is active) | |
| 06/25/2025 | RSBU - Building Final | Passed | ||
| 06/25/2025 | COT - RSOL - Electrical Final Solar Project | Passed |