Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP pending solar final |
|
| 06/25/2025 | BULD - Electrical Clearance | Passed | Approved battery addition - BAT Clearance to TEP is required (solar meter is active) |