Permit: TC-RES-0325-01431
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7712 E PECAN ST
Address NEW:
7712 E PECAN ST
Apply Date:
03/20/2025
Applicant:
TFS Solar
Description:
Roof mount 8.70kW DC photovoltaic solar system; 20 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on a new 200A bus load center with 200A MCB
Permit Reviews
Permit Number - TC-RES-0325-01431
Permit Status: Complete
Permit Description: Roof mount 8.70kW DC photovoltaic solar system; 20 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on a new 200A bus load center with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2025 | RESIDENTIAL SOLAR v.1 | 05/19/2025 | REQUIRES RESUBMIT |
| 05/23/2025 | RESIDENTIAL SOLAR v.2 | 05/23/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0325-01431
Permit Status: Complete
Permit Description: Roof mount 8.70kW DC photovoltaic solar system; 20 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on a new 200A bus load center with 200A MCB
| Date | Description | Comments |
|---|---|---|
| 04/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01431
Permite Description: Roof mount 8.70kW DC photovoltaic solar system; 20 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on a new 200A bus load center with 200A MCB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 6.30.25 Grounding and bonding verified. Address label present. Panel secured. Partial pass pending solar. TEP CLEARANCE FOR DGC/INCR |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01431
Permit Description: Roof mount 8.70kW DC photovoltaic solar system; 20 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on a new 200A bus load center with 200A MCB
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 07/03/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 07/03/2025 | RSBU - Building Final | Passed |