Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | BULD - Electrical Clearance | Partial Pass | 6.30.25 Grounding and bonding verified. Address label present. Panel secured. Partial pass pending solar. TEP CLEARANCE FOR DGC/INCR |
|
| 07/03/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |