Permit: TC-RES-0325-01233
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
8449 E 2ND PL
Address NEW:
8449 E 2ND PL
Apply Date:
03/09/2025
Applicant:
Greg Miller
Description:
New in ground swimming pool
Permit Reviews
Permit Number - TC-RES-0325-01233
Permit Status: Complete
Permit Description: New in ground swimming pool
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2025 | RESIDENTIAL POOL v.2 | 04/08/2025 | REQUIRES RESUBMIT |
| 04/16/2025 | RESIDENTIAL POOL v.3 | 04/29/2025 | APPROVED |
| 03/11/2025 | RESIDENTIAL POOL v.1 | 04/01/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0325-01233
Permit Status: Complete
Permit Description: New in ground swimming pool
| Date | Description | Comments |
|---|---|---|
| 04/29/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01233
Permite Description: New in ground swimming pool
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01233
Permit Description: New in ground swimming pool
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2025 | Pool/Spa - Bonding Grip | Passed | ||
| 05/20/2025 | Pool/Spa - Electric | Passed | ||
| 05/20/2025 | Pool/Spa - Plumbing | Passed | ||
| 05/20/2025 | Pool/Spa - Pre-Gunite | Passed | ||
| 05/20/2025 | RSBU - Building Final | Passed | ||
| 05/20/2025 | RSEL - Electrical Progress | Passed | ||
| 06/09/2025 | COT - RSEL - Electrical Final | Passed | passed final 6/9/25 | |
| 06/09/2025 | Pool/Spa - Final/Barrier | Passed | passed final 6/9/25 |