Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
6328 S DESERT PEAK DR
Apply Date:
03/05/2025
Applicant:
Marytine Ramos
Description:
Installation of Roof mounted 8.20kW PV System with Battery

Permit Reviews

Permit Number - TC-RES-0325-01185
Permit Status: Complete
Permit Description: Installation of Roof mounted 8.20kW PV System with Battery
Start Date Submittal Complete Date Status  
03/05/2025 RESIDENTIAL SOLAR v.1 04/02/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0325-01185
Permit Description: Installation of Roof mounted 8.20kW PV System with Battery
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/03/2025 COT - RSOL - Electrical Final Solar Project Passed 7.3.25
PV system is installed according to plans. All equipment is secured. Safety/info labels at all equipment and conduits verified. Proper conductors and breakers used throughout. Address label observed. Meter number recorded. Neutrals grounds and bonds verified. DGC/BAT CLEARANCE
07/03/2025 COT - RSOL - Grounding/Bonding Solar Project Passed 7.3.25
PV system is installed according to plans. All equipment is secured. Safety/info labels at all equipment and conduits verified. Proper conductors and breakers used throughout. Address label observed. Meter number recorded. Neutrals grounds and bonds verified. DGC/DGL/BAT CLEARANCE
07/03/2025 BULD - Electrical Clearance Passed 7.3.25
PV system is installed according to plans. All equipment is secured. Safety/info labels at all equipment and conduits verified. Proper conductors and breakers used throughout. Address label observed. Meter number recorded. Neutrals grounds and bonds verified. DGC/BAT CLEARANCE