Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP at noon Pending solar |
|
| 07/03/2025 | BULD - Electrical Clearance | Passed | 7.3.25 PV system is installed according to plans. All equipment is secured. Safety/info labels at all equipment and conduits verified. Proper conductors and breakers used throughout. Address label observed. Meter number recorded. Neutrals grounds and bonds verified. DGC/BAT CLEARANCE |