Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
06/27/2025 BULD - Electrical Clearance Partial Pass Partial for the Tesla meter switch - DGL Clearance was called into TEP at noon
Pending solar
07/03/2025 BULD - Electrical Clearance Passed 7.3.25
PV system is installed according to plans. All equipment is secured. Safety/info labels at all equipment and conduits verified. Proper conductors and breakers used throughout. Address label observed. Meter number recorded. Neutrals grounds and bonds verified. DGC/BAT CLEARANCE