Permit: TC-RES-0323-04011
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3003 S MISSION RD
Address NEW:
3003 S MISSION RD
Apply Date:
03/30/2023
Applicant:
AJ Baray
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0323-04011
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/04/2023 | APPROVED |
| 04/03/2023 | RESIDENTIAL NEW DWELLING v.1 | 05/01/2023 | REQUIRES RESUBMIT |
| 09/07/2023 | RESIDENTIAL NEW DWELLING v.1 | 09/08/2023 | APPROVED |
| 07/15/2023 | RESIDENTIAL NEW DWELLING v.2 | 07/26/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0323-04011
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 07/26/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. | |
| 04/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/20/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-04011
Permite Description: SFR
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2025 | COT - RSPL - Sewer | N/A | Partial Pass | 9/4/25: Septic tank under pressure, ABS from house to September tank must be tested prior to backfill, shading required, tracer wire required, leech field not ready. |
| 10/02/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | SMOKE DETECTORS COMMUNICATION HAMMER ARRESTOR DISHWASHER GFCI ISLAND (rocha fixing) RECEPTACLE POWDER ROOM CAULK TOILET POWDER CAULK MASTER TOILET WEATHER RESISTANT EXTERIOR MASTER EXT PLUG GARAGE GFCIs ARC FAULT BREAKERS PANEL NON METALLIC PLUMBING (on panel) SHARPIE ALL LABELS 10/2/2025 |
| 10/02/2025 | RSBU - Building Final | N/A | Re-inspection required | SMOKE DETECTORS COMMUNICATION HAMMER ARRESTOR DISHWASHER GFCI ISLAND (rocha fixing) RECEPTACLE POWDER ROOM CAULK TOILET POWDER CAULK MASTER TOILET WEATHER RESISTANT EXTERIOR MASTER EXT PLUG GARAGE GFCIs ARC FAULT BREAKERS PANEL NON METALLIC PLUMBING (on panel) SHARPIE ALL LABELS 10/2/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-04011
Permit Description: SFR
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2023 | COT - RSPL - Rough Soil | Passed | Unable to locate job; post address visible from street. 9/12/23:passed |
|
| 10/09/2023 | COT - RSBU - Preslab | Passed | ||
| 10/09/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/09/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 10/09/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/06/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/06/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 01/09/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 01/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 01/15/25 Passed. All corrections have been made. |
|
| 08/04/2025 | COT - RSPL - Yard Water Line | Passed | 8-4-25: main water line approved. Okay to backfill with shading materials. | |
| 08/04/2025 | BULD - Electrical Clearance | Passed | 8-4-25: okay for panel to be energized. ECO clearance issued to TEP. | |
| 08/04/2025 | COT - BULD - SWG Clearance | Passed | 8-4-25: okay for SWG to install meter-Clearance issued. | |
| 09/16/2025 | COT - RSPL - Sewer | Passed | ||
| 10/02/2025 | COT - RSME - Mechanical Final | Passed | ||
| 10/02/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/02/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 10/10/2025 | COT - RSEL - Electrical Final | Passed | 10-10-25: corrections made. Electrical & building finals approved. | |
| 10/10/2025 | RSBU - Building Final | Passed | 10-10-25: corrections made. Electrical & building finals approved. |