Permit: TC-RES-0323-03511
Permit Details
Apply Date:
03/11/2023
Applicant:
Jesus Cedeno
Description:
retaining wall for dp22-0271 and t22cm07078 - per comments
Permit Reviews
Permit Number - TC-RES-0323-03511
Permit Status: Issued
Permit Description: retaining wall for dp22-0271 and t22cm07078 - per comments
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/17/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/14/2023 | APPROVED |
04/27/2023 | RESIDENTIAL NEW DWELLING v.1 | 05/17/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0323-03511
Permit Status: Issued
Permit Description: retaining wall for dp22-0271 and t22cm07078 - per comments
Date | Description | Comments |
---|---|---|
04/18/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0323-03511
Permite Description: retaining wall for dp22-0271 and t22cm07078 - per comments
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Canceled | Canceled per homeowner. 6/20/2023 |
08/18/2023 | SITE - Zoning Final | N/A | Not Ready | Work has started on the site and some of the installation of walls and retaining walls but that work is all under the building permit. The site work includes the installation of HDPE pipe underneath the driveway and the installation of the driveway. The contractor has been advised that this work will need a certified letter from the engineer of record since it was done and was not inspected by engineering. |
08/18/2023 | ENGR Engineering Final | N/A | Not Ready | Work has started on the site and some of the installation of walls and retaining walls but that work is all under the building permit. The site work includes the installation of HDPE pipe underneath the driveway and the installation of the driveway. The contractor has been advised that this work will need a certified letter from the engineer of record since it was done and was not inspected by engineering. |
08/18/2023 | RSBU - Building Final | N/A | Partial Pass | Partial pass . Pending other inspections. 8/18/2023 |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0323-03511
Permit Description: retaining wall for dp22-0271 and t22cm07078 - per comments
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/28/2023 | COT - RSBU - Masonry Pregrout | Passed | ||
08/18/2023 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
08/18/2023 | RSBU - Building Progress | Passed |