Permit: TC-RES-0226-01017
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
2761 N HASKELL DR
Address NEW:
2761 N HASKELL DR
Apply Date:
02/27/2026
Applicant:
Randall Kidd
Description:
upgrade electric service to 200 amps
Permit Reviews
Permit Number - TC-RES-0226-01017
Permit Status: Inspections complete
Permit Description: upgrade electric service to 200 amps
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/02/2026 | RESIDENTIAL ADD/ALT v.1 | 03/02/2026 | REQUIRES RESUBMIT |
| 03/11/2026 | RESIDENTIAL ADD/ALT v.2 | 03/11/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-01017
Permit Status: Inspections complete
Permit Description: upgrade electric service to 200 amps
| Date | Description | Comments |
|---|---|---|
| 03/02/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0226-01017
Permite Description: upgrade electric service to 200 amps
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0226-01017
Permit Description: upgrade electric service to 200 amps
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2026 | COT - RSEL - Electrical Final | Passed | 03/25/2026 Verified all branch circuits landed and labeled at dead front, SPD in place. |
|
| 03/25/2026 | RSEL - Electrical Progress | Passed | ||
| 04/07/2026 | BULD - Electrical Clearance | Passed | 04/07/2026 Approved clearance TEP INCR. Passed on 3/25/2026, contractor stated TEP did not receive clearance. |