Permit: TC-RES-0226-00533
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
6209 S 6TH AV
Address NEW:
6209 S 6TH AV
Apply Date:
02/03/2026
Applicant:
GGV Designs
Description:
Storage and Bathroom Addition
Permit Reviews
Permit Number - TC-RES-0226-00533
Permit Status: Inspections
Permit Description: Storage and Bathroom Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/06/2026 | RESIDENTIAL ADD/ALT v.1 | 03/10/2026 | REQUIRES RESUBMIT |
| 05/14/2026 | ADMINISTRATIVE v.2 | N/A | APPROVED |
| 05/13/2026 | ADMINISTRATIVE v.1 | N/A | REQUIRES RESUBMIT |
| 05/07/2026 | RESIDENTIAL ADD/ALT v.2 | 05/13/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0226-00533
Permit Status: Inspections
Permit Description: Storage and Bathroom Addition
| Date | Description | Comments |
|---|---|---|
| 02/06/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0226-00533
Permit Description: Storage and Bathroom Addition
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/09/2026 | COT - RSPL - Rough Soil | Passed | ||
| 06/11/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/16/2026 | COT - RSBU - Interior Shear Bracing | Passed | 6.16.26 approved |
|
| 07/07/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/07/2026 | RSBU - Building Final | Passed | ||
| 07/07/2026 | COT - RSEL - Electrical Final | Passed | 07/07/2026 Verified added GFCI to receptacle in bathroom. |