Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/19/2025
Applicant:
Martha Johnson
Description:
Pull all needed permits to complete work Prep all work areas as needed to include floor protection and placement of plastic to help prevent dust Cut all needed drywall to complete work approximately 20-25 holes Install all needed Aqua PEX to the following fixtures Laundry-install code required hammer arrestors and 1/4 turn valves Master bathroom- connect to existing PEX at tub, connect to existing shower valve Guest bathroom- connect to existing shower valve, run type L copper through cabinets to avoid disruption of paint insulate when complete Kitchen and ice maker Connect to existing connections Rear hose bib- Install vacuum breaker to meet code Install all new quarter turn emergency shut off valves at all required fixtures and stainless steel supply lines Test system and ensure proper function Insulate main water service, rear pool fill and install weatherproof tape Obtain inspection Water left on to one full bathroom and kitchen during course of work Approximate job timeline is estimated to be 4 days Drywall, and paint is not included in this estimate 5yr Ram Plumbing provided warranty 25yr manufacturer warranty on Aqua PEX

Permit Reviews

Permit Number - TC-RES-0225-00928
Permit Status: Inspections complete
Permit Description: Pull all needed permits to complete work Prep all work areas as needed to include floor protection and placement of plastic to help prevent dust Cut all needed drywall to complete work approximately 20-25 holes Install all needed Aqua PEX to the following fixtures Laundry-install code required hammer arrestors and 1/4 turn valves Master bathroom- connect to existing PEX at tub, connect to existing shower valve Guest bathroom- connect to existing shower valve, run type L copper through cabinets to avoid disruption of paint insulate when complete Kitchen and ice maker Connect to existing connections Rear hose bib- Install vacuum breaker to meet code Install all new quarter turn emergency shut off valves at all required fixtures and stainless steel supply lines Test system and ensure proper function Insulate main water service, rear pool fill and install weatherproof tape Obtain inspection Water left on to one full bathroom and kitchen during course of work Approximate job timeline is estimated to be 4 days Drywall, and paint is not included in this estimate 5yr Ram Plumbing provided warranty 25yr manufacturer warranty on Aqua PEX
Start Date Submittal Complete Date Status  
02/19/2025 RESIDENTIAL SIMPLE REVIEW v.1 02/20/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0225-00928
Permit Status: Inspections complete
Permit Description: Pull all needed permits to complete work Prep all work areas as needed to include floor protection and placement of plastic to help prevent dust Cut all needed drywall to complete work approximately 20-25 holes Install all needed Aqua PEX to the following fixtures Laundry-install code required hammer arrestors and 1/4 turn valves Master bathroom- connect to existing PEX at tub, connect to existing shower valve Guest bathroom- connect to existing shower valve, run type L copper through cabinets to avoid disruption of paint insulate when complete Kitchen and ice maker Connect to existing connections Rear hose bib- Install vacuum breaker to meet code Install all new quarter turn emergency shut off valves at all required fixtures and stainless steel supply lines Test system and ensure proper function Insulate main water service, rear pool fill and install weatherproof tape Obtain inspection Water left on to one full bathroom and kitchen during course of work Approximate job timeline is estimated to be 4 days Drywall, and paint is not included in this estimate 5yr Ram Plumbing provided warranty 25yr manufacturer warranty on Aqua PEX
Date Description Comments
02/19/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/owner-builder-affidavit_020625.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0225-00928
Permite Description: Pull all needed permits to complete work Prep all work areas as needed to include floor protection and placement of plastic to help prevent dust Cut all needed drywall to complete work approximately 20-25 holes Install all needed Aqua PEX to the following fixtures Laundry-install code required hammer arrestors and 1/4 turn valves Master bathroom- connect to existing PEX at tub, connect to existing shower valve Guest bathroom- connect to existing shower valve, run type L copper through cabinets to avoid disruption of paint insulate when complete Kitchen and ice maker Connect to existing connections Rear hose bib- Install vacuum breaker to meet code Install all new quarter turn emergency shut off valves at all required fixtures and stainless steel supply lines Test system and ensure proper function Insulate main water service, rear pool fill and install weatherproof tape Obtain inspection Water left on to one full bathroom and kitchen during course of work Approximate job timeline is estimated to be 4 days Drywall, and paint is not included in this estimate 5yr Ram Plumbing provided warranty 25yr manufacturer warranty on Aqua PEX
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/28/2025 COT - RSPL - Plumbing Final N/A Canceled canceled, water heater not attached

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0225-00928
Permit Description: Pull all needed permits to complete work Prep all work areas as needed to include floor protection and placement of plastic to help prevent dust Cut all needed drywall to complete work approximately 20-25 holes Install all needed Aqua PEX to the following fixtures Laundry-install code required hammer arrestors and 1/4 turn valves Master bathroom- connect to existing PEX at tub, connect to existing shower valve Guest bathroom- connect to existing shower valve, run type L copper through cabinets to avoid disruption of paint insulate when complete Kitchen and ice maker Connect to existing connections Rear hose bib- Install vacuum breaker to meet code Install all new quarter turn emergency shut off valves at all required fixtures and stainless steel supply lines Test system and ensure proper function Insulate main water service, rear pool fill and install weatherproof tape Obtain inspection Water left on to one full bathroom and kitchen during course of work Approximate job timeline is estimated to be 4 days Drywall, and paint is not included in this estimate 5yr Ram Plumbing provided warranty 25yr manufacturer warranty on Aqua PEX
Total Completed Inspections - 1
Date Description Inspector Results Comments
02/28/2025 RSBU - Building Final Passed Repipe per plans, ok to cover and seal 2/28/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
10940 E SISKIN PL PLAN_V1.PDF DOCUMENTS VIEW