Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 10940 E SISKIN PL
Search
Parcel Attributes
Parcel | 133515790 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | R-1 |
Tucson Ward | Ward 2 |
Tucson Registered Neighborhood | Houghton East |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 10940 E SISKIN PL
Date - 03/13/2025 5:28 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 03/13/2025 5:28 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-86-11 | Cienega, Ltd. - Houghton Road | R-1 | Effectuated | 03/04/2010 |
Permits
Address: 10940 E SISKIN PL
Date - 03/13/2025 5:28 a.m.
Total Number Of Permits - (1)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-RES-0225-00928 | Inspections Complete | 02/19/2025 | 08/27/2025 | Residential Building - One or Two Family | Pull all needed permits to complete work Prep all work areas as needed to include floor protection and placement of plastic to help prevent dust Cut all needed drywall to complete work approximately 20-25 holes Install all needed Aqua PEX to the following fixtures Laundry-install code required hammer arrestors and 1/4 turn valves Master bathroom- connect to existing PEX at tub, connect to existing shower valve Guest bathroom- connect to existing shower valve, run type L copper through cabinets to avoid disruption of paint insulate when complete Kitchen and ice maker Connect to existing connections Rear hose bib- Install vacuum breaker to meet code Install all new quarter turn emergency shut off valves at all required fixtures and stainless steel supply lines Test system and ensure proper function Insulate main water service, rear pool fill and install weatherproof tape Obtain inspection Water left on to one full bathroom and kitchen during course of work Approximate job timeline is estimated to be 4 days Drywall, and paint is not included in this estimate 5yr Ram Plumbing provided warranty 25yr manufacturer warranty on Aqua PEX |