Permit: TC-RES-0225-00891
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9521 E IRENE ST
Address NEW:
9521 E IRENE ST
Apply Date:
02/17/2025
Applicant:
Maria Theran
Description:
PHOTOVOLTAIC ROOF MOUNT SYSTEM18 MODULES-ROOF MOUNTED - 7.290 KW DC, 11.500 KW AC UPGRADE MAIN SERVICE PANEL TO NEW 225A RATED BUS WITH 200A MAIN BREAKER
Permit Reviews
Permit Number - TC-RES-0225-00891
Permit Status: Complete
Permit Description: PHOTOVOLTAIC ROOF MOUNT SYSTEM18 MODULES-ROOF MOUNTED - 7.290 KW DC, 11.500 KW AC
UPGRADE MAIN SERVICE PANEL TO NEW 225A RATED BUS WITH 200A MAIN BREAKER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/19/2025 | RESIDENTIAL SOLAR v.1 | 03/24/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0225-00891
Permit Status: Complete
Permit Description: PHOTOVOLTAIC ROOF MOUNT SYSTEM18 MODULES-ROOF MOUNTED - 7.290 KW DC, 11.500 KW AC
UPGRADE MAIN SERVICE PANEL TO NEW 225A RATED BUS WITH 200A MAIN BREAKER
| Date | Description | Comments |
|---|---|---|
| 03/20/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-00891
Permite Description: PHOTOVOLTAIC ROOF MOUNT SYSTEM18 MODULES-ROOF MOUNTED - 7.290 KW DC, 11.500 KW AC
UPGRADE MAIN SERVICE PANEL TO NEW 225A RATED BUS WITH 200A MAIN BREAKER
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | BULD - Electrical Clearance | N/A | Not Ready | Couldn't contact 6.30.25 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-00891
Permit Description: PHOTOVOLTAIC ROOF MOUNT SYSTEM18 MODULES-ROOF MOUNTED - 7.290 KW DC, 11.500 KW AC
UPGRADE MAIN SERVICE PANEL TO NEW 225A RATED BUS WITH 200A MAIN BREAKER
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Passed 5/30/25 CLEARANCE DGC | |
| 05/30/2025 | RSBU - Building Final | Passed | Passed 5/30/25 CLEARANCE DGC | |
| 07/09/2025 | BULD - Electrical Clearance | Passed | Approved battery - BAT Clearance to TEP is required for the solar meter |