Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2025 | BULD - Electrical Clearance | Passed | 05/01/25 TEP Clearance: INCR, called TEP @ 3:15. |
|
| 06/30/2025 | BULD - Electrical Clearance | Not Ready | Couldn't contact 6.30.25 | |
| 07/03/2025 | BULD - Electrical Clearance | Canceled | NR | |
| 07/09/2025 | BULD - Electrical Clearance | Passed | Approved battery - BAT Clearance to TEP is required for the solar meter |