Permit: TC-RES-0225-00870
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2141 N SONOITA AV
Address NEW:
2141 N SONOITA AV
Apply Date:
02/16/2025
Applicant:
Hailey McGaw
Description:
10.125kW DC, 11.500kW AC, 13.50kWh ENERGY STORAGE SYSTEM (1)TESLA POWERWALL 3 INTEGRATED SOLAR BATTERY 1707000-XX-Y (240V) (1)TESLA BACKUP SWITCH (1624171-XX-Y) (9) TESLA MLPE MCI-2- RAPID SHUTDOWN DEVICE (25)HYPERION HY-DH108P8B-405 (405W)
Permit Reviews
Permit Number - TC-RES-0225-00870
Permit Status: Complete
Permit Description: 10.125kW DC, 11.500kW AC, 13.50kWh ENERGY STORAGE SYSTEM
(1)TESLA POWERWALL 3 INTEGRATED SOLAR BATTERY 1707000-XX-Y (240V)
(1)TESLA BACKUP SWITCH (1624171-XX-Y)
(9) TESLA MLPE MCI-2- RAPID SHUTDOWN DEVICE
(25)HYPERION HY-DH108P8B-405 (405W)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/18/2025 | RESIDENTIAL SOLAR v.1 | 03/19/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-00870
Permite Description: 10.125kW DC, 11.500kW AC, 13.50kWh ENERGY STORAGE SYSTEM
(1)TESLA POWERWALL 3 INTEGRATED SOLAR BATTERY 1707000-XX-Y (240V)
(1)TESLA BACKUP SWITCH (1624171-XX-Y)
(9) TESLA MLPE MCI-2- RAPID SHUTDOWN DEVICE
(25)HYPERION HY-DH108P8B-405 (405W)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | Not ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0225-00870
Permit Description: 10.125kW DC, 11.500kW AC, 13.50kWh ENERGY STORAGE SYSTEM
(1)TESLA POWERWALL 3 INTEGRATED SOLAR BATTERY 1707000-XX-Y (240V)
(1)TESLA BACKUP SWITCH (1624171-XX-Y)
(9) TESLA MLPE MCI-2- RAPID SHUTDOWN DEVICE
(25)HYPERION HY-DH108P8B-405 (405W)
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | RSBU - Building Final | Passed | ||
| 05/08/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 05/23/2025 | BULD - Electrical Clearance | Passed | REVISED - Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required |