Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | BULD - Electrical Clearance | Partial Pass | 05/06/25 TEP CLEARANCE: DGL, partial pass pending solar. |
|
| 05/08/2025 | BULD - Electrical Clearance | Passed | ||
| 05/08/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance is required for the solar meter | |
| 05/23/2025 | BULD - Electrical Clearance | Passed | REVISED - Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required |