Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/11/2025
Applicant:
Bill Clark
Description:
REV_2, Relocate water heater and exterior lights; ADU

Permit Reviews

Permit Number - TC-RES-0225-00778
Permit Status: Inspections complete
Permit Description: REV_2, Relocate water heater and exterior lights; ADU
Start Date Submittal Complete Date Status  
06/05/2025 RESIDENTIAL NEW DWELLING v.5 06/06/2025 APPROVED Review Details
04/25/2025 RESIDENTIAL NEW DWELLING v.2 04/25/2025 REQUIRES RESUBMIT Review Details
06/05/2025 RESIDENTIAL NEW DWELLING v.4 06/05/2025 REQUIRES RESUBMIT Review Details
07/31/2025 RESIDENTIAL NEW DWELLING REVISION v.1 08/12/2025 APPROVED Review Details
05/01/2025 RESIDENTIAL NEW DWELLING v.3 06/05/2025 REQUIRES RESUBMIT Review Details
12/18/2025 RESIDENTIAL ADU REVISION v.1 12/29/2025 APPROVED Review Details
02/28/2025 RESIDENTIAL NEW DWELLING v.1 04/01/2025 REQUIRES RESUBMIT Review Details
06/06/2025 RESTAMP - RESIDENTIAL v.1 06/09/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0225-00778
Permit Status: Inspections complete
Permit Description: REV_2, Relocate water heater and exterior lights; ADU
Total Outstanding Activity Conditions - 1
Date Name
03/25/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-RES-0225-00778
Permit Status: Inspections complete
Permit Description: REV_2, Relocate water heater and exterior lights; ADU
Date Description Comments
03/25/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
02/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0225-00778
Permite Description: REV_2, Relocate water heater and exterior lights; ADU
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/31/2025 COT - RSEL - Electrical Underground N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0225-00778
Permit Description: REV_2, Relocate water heater and exterior lights; ADU
Total Completed Inspections - 14
Date Description Inspector Results Comments
08/13/2025 COT - RSBU - Preslab Passed 8.13.2025
Corrections made. Plans revised. Okay for concrete placement.
08/13/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 8.13.2025
Corrections made. Plans revised. Okay for concrete placement.
09/04/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1. Provide blocking for future grab bars in bathroom wall parallel to W.C. 36" from finished floor 42" long. Okay to proceed will check at intermediate.
09/04/2025 COT - RSBU - Roof Nailing Passed
09/12/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 9/12/25
09/12/2025 COT - RSPL - Yard Water Line Passed Passed 9/12/25
11/18/2025 BULD - Electrical Clearance Passed Clearance for TEP ECO. UNIT #2. 11/18/2025
12/17/2025 COT - RSEL - Grounding/Bonding Passed
12/17/2025 COT - RSME - Mechanical Final Passed
01/05/2026 RSBU - Building Final Passed Approved. 1/5/2026
12/31/2025 COT - RSEL - Electrical Final Passed
12/31/2025 COT - RSEL - Outdoor Lighting Passed Revision has been sent in and reviewed. 12/31/2025
12/31/2025 COT - RSPL - Plumbing Final Passed
12/31/2025 COT - RSPL - Rough Soil Passed Approved per R.C. 12/31/2025

Documents

File Name Document Type  
301NLONGFELLOWAVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
REVISION LETTER 301 N LONGFELLOW AVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REVISION NARRATIVE LONGFELLOW_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LONGFELLOW REVISED__V1.PDF DOCUMENTS VIEW