Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/05/2025
Applicant:
Allan Dunklee
Description:
ADU Casita

Permit Reviews

Permit Number - TC-RES-0225-00668
Permit Status: Complete
Permit Description: ADU Casita
Start Date Submittal Complete Date Status  
05/27/2025 RESTAMP - RESIDENTIAL v.1 05/29/2025 APPROVED Review Details
02/07/2025 RESIDENTIAL NEW DWELLING v.1 03/11/2025 REQUIRES RESUBMIT Review Details
05/01/2025 RESIDENTIAL NEW DWELLING v.2 05/27/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0225-00668
Permit Status: Complete
Permit Description: ADU Casita
Date Description Comments
02/25/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0225-00668
Permite Description: ADU Casita
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/15/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required Needs anchor bolt at front near window marked, missing edge nails at rear of house marked

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0225-00668
Permit Description: ADU Casita
Total Completed Inspections - 13
Date Description Inspector Results Comments
07/25/2025 COT - RSPL - Rough Soil Passed 7-25-25; underground plumbing approved. Okay to backfill.
07/31/2025 COT - RSBU - Preslab Passed 7.31.25
Verified -er plans. Depth verified. Compaction verified. Rebar verified. Clearance verified. Uffer verified. PROCEED.
07/31/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 7.31.25
Verified -er plans. Depth verified. Compaction verified. Rebar verified. Clearance verified. Uffer verified. PROCEED.
07/31/2025 COT - RSPL - Yard Water Line Passed 7.31.25
Depth verified, blue tracer verified, proceed
08/15/2025 COT - RSBU - Roof Nailing Passed Passed 8/15/25
08/27/2025 BULD - Electrical Clearance Passed Passed 8/27/25 Clearance ECO
08/27/2025 COT - RSEL - Grounding/Bonding Passed Passed 8/27/25
10/31/2025 RSBU - Building Final Passed
10/31/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/31/2025 COT - RSEL - Electrical Final Passed
10/31/2025 COT - RSEL - Outdoor Lighting Passed
10/31/2025 COT - RSME - Mechanical Final Passed
10/31/2025 COT - RSPL - Plumbing Final Passed