Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2025 | COT - RSBU - Preslab | Passed | 7.31.25 Verified -er plans. Depth verified. Compaction verified. Rebar verified. Clearance verified. Uffer verified. PROCEED. |