Permit: TC-RES-0224-01090
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
8341 E WILDCAT DR
Apply Date:
02/26/2024
Applicant:
TFS Solar
Description:
roof mount 12.04 kW DC photovoltaic solar system; 28 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 125A bus with 125A MCB
Permit Reviews
Permit Number - TC-RES-0224-01090
Permit Status: Inspections complete
Permit Description: roof mount 12.04 kW DC photovoltaic solar system; 28 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 125A bus with 125A MCB
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/09/2024 | RESIDENTIAL SOLAR v.2 | 05/06/2024 | APPROVED |
05/06/2024 | RESTAMP - RESIDENTIAL v.1 | 05/07/2024 | APPROVED |
02/26/2024 | RESIDENTIAL SOLAR v.1 | 03/18/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0224-01090
Permite Description: roof mount 12.04 kW DC photovoltaic solar system; 28 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 125A bus with 125A MCB
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/16/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 60A meter adapter, DGL Clearance was called into TEP Pending solar |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0224-01090
Permit Description: roof mount 12.04 kW DC photovoltaic solar system; 28 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 125A bus with 125A MCB
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/05/2024 | RSBU - Building Final | Passed | ||
06/05/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
06/05/2024 | BULD - Electrical Clearance | Passed | 6/5/2024 clearance for TEP DGC. |