Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter adapter, DGL Clearance was called into TEP Pending solar |
|
| 06/05/2024 | BULD - Electrical Clearance | Passed | 6/5/2024 clearance for TEP DGC. |