Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0223-02892
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
10330 E SPEEDWAY BL
Address NEW:
10330 E SPEEDWAY BL
Apply Date:
02/15/2023
Applicant:
Aiden Hankel
Description:
SFR R1: Updated truss and HVAC
Permit Reviews
Permit Number - TC-RES-0223-02892
Permit Status: Complete
Permit Description: SFR R1: Updated truss and HVAC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/30/2024 | REQUIRES RESUBMIT |
| 03/01/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/04/2023 | APPROVED |
| 08/25/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/25/2023 | REQUIRES RESUBMIT |
| 12/13/2023 | RESIDENTIAL NEW DWELLING v.2 | 01/03/2024 | APPROVED |
| 08/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/05/2024 | REQUIRES RESUBMIT |
| 08/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/22/2024 | APPROVED |
| 08/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 08/14/2024 | APPROVED |
| 08/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/19/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0223-02892
Permit Status: Complete
Permit Description: SFR R1: Updated truss and HVAC
| Date | Description | Comments |
|---|---|---|
| 04/04/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 03/13/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/05/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/15/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 03/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0223-02892
Permite Description: SFR R1: Updated truss and HVAC
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2023 | COT - RSEL - Grounding/Bonding | N/A | Deferred | |
| 04/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | Remove all insulation and netting from framing to allow inspection. |
| 03/20/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | Provide verification from Engineer of Record that hanger in garage is adequate to support load imposed by two-ply girder to Microlam, that microlam connection(s) to I-joists at cantilever are adequate to transmit gravity loads imposed by garage trusses and girder connected to microlam by hangers to the bearing wall, and that platform framing in great room is acceptable in lieu of the balloon framing shown on plans. OK to proceed at own risk; reschedule with Intermediate, or before if additional requested engineering does not support proceeding. |
| 04/05/2024 | COT - RSPL - Sewer | N/A | Not Applicable | Septic line from house. |
| 06/25/2024 | COT - RSEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0223-02892
Permit Description: SFR R1: Updated truss and HVAC
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2023 | COT - RSBU - Preslab | Passed | 9/5/23: all corrections made | |
| 03/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 03/20/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 04/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4/24/24: all netting and insulation have been removed for inspection. Simpson hanger has been added to support beam in garage and full span ledger board has been installed to end of TJI Floor joists for 2nd floor. All mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall on entire house. | |
| 05/09/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/20/2024 | BULD - Electrical Clearance | Passed | ||
| 07/12/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is holding 15# of air with no leaks. Okay to proceed. | |
| 07/12/2024 | COT - BULD - SWG Clearance | Passed | Gas line is holding 15# of air with no leaks. SWG Clearance is being issued to Southwest Gas. Okay to install meter and turn on gas. | |
| 07/29/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 4/24/24 by R. Mellecker. | |
| 07/29/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/29/2024 | RSPL - Plumbing Progress | Passed | ||
| 07/29/2024 | COT - RSPL - Sewer | Passed | Not Applicable house is on its own septic system. | |
| 07/29/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, plumbing, fire suppression/alarm work is complete. Mechanical, electrical, and plumbing fixtures are installed and functioning correctly. Main and sub-panel are properly installed and labeled, with AFCI & GFCI breakers installed for required outlets. A/C registers and thermostats are installed. Okay to issue Certificate of Occupancy for this permit. | |
| 07/29/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, plumbing, fire suppression/alarm work is complete. Mechanical, electrical, and plumbing fixtures are installed and functioning correctly. Main and sub-panel are properly installed and labeled, with AFCI & GFCI breakers installed for required outlets. A/C registers and thermostats are installed. Okay to issue Certificate of Occupancy for this permit. | |
| 07/29/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, plumbing, fire suppression/alarm work is complete. Mechanical, electrical, and plumbing fixtures are installed and functioning correctly. Main and sub-panel are properly installed and labeled, with AFCI & GFCI breakers installed for required outlets. A/C registers and thermostats are installed. Okay to issue Certificate of Occupancy for this permit. | |
| 07/29/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, plumbing, fire suppression/alarm work is complete. Mechanical, electrical, and plumbing fixtures are installed and functioning correctly. Main and sub-panel are properly installed and labeled, with AFCI & GFCI breakers installed for required outlets. A/C registers and thermostats are installed. Okay to issue Certificate of Occupancy for this permit. | |
| 08/02/2024 | COT - FCON - Fire - Final | Passed | ||
| 08/16/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed per plans and meets city requirements. | |
| 08/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/21/2024 | COT - FCON - Sprinkler - Final | Passed | Approved on 7/15/2024 on permit #TF-FCP-0324-00170 | |
| 08/21/2024 | COT - RSPL - Rough Soil | Passed | Submit letter from licensed contractor on company letterhead taking responsibility for the work included in this inspection. Letter has been submitted. EWS |