Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
860 N STONER AV
Address NEW:
860 N STONER AV
Apply Date:
01/20/2026
Applicant:
Marytine Ramos
Description:
REV_1, Equipment relocation; Installation of 9.02 kW PV System with SE battery and 225A MPU

Permit Reviews

Permit Number - TC-RES-0126-00263
Permit Status: Complete
Permit Description: REV_1, Equipment relocation; Installation of 9.02 kW PV System with SE battery and 225A MPU
Start Date Submittal Complete Date Status  
04/02/2026 RESIDENTIAL SOLAR REVISION v.1 04/15/2026 REQUIRES RESUBMIT Review Details
04/16/2026 RESIDENTIAL SOLAR REVISION v.2 04/21/2026 APPROVED Review Details
01/21/2026 RESIDENTIAL SOLAR v.1 01/28/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0126-00263
Permit Status: Complete
Permit Description: REV_1, Equipment relocation; Installation of 9.02 kW PV System with SE battery and 225A MPU
Date Description Comments
01/21/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0126-00263
Permit Description: REV_1, Equipment relocation; Installation of 9.02 kW PV System with SE battery and 225A MPU
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/29/2026 BULD - Electrical Clearance Passed 4.29.26
Approved for DGC/bat
04/29/2026 RSBU - Building Final Passed
04/29/2026 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-OUR101150-ABCAD 2-2026-04-17_21-45-26_V2.PDF DOCUMENTS VIEW
OUR101150-CHAMBERLIN_AHJ RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
PE CALCS_CHAMBERLIN RESIDENCE-2026-04-17_21-45-26_V2.PDF DOCUMENTS VIEW
REVISION LETTER - ANDREA CHAMBERLIN_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-OUR101150-CHAMBERLIN_CAD 1-2026-01-19_19-53-21_STAMPED-2026-01-19_15-55-55_V1.PDF DOCUMENTS VIEW
PE CALCS_CHAMBERLIN RESIDENCE-2026-01-19_15-55-55_V1.PDF DOCUMENTS VIEW