Permit: TC-RES-0126-00025
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1106 W HURON ST UNIT 1
Address NEW:
1106 W HURON ST UNIT 1
Apply Date:
01/04/2026
Applicant:
Albert Quihuis
Description:
Middle Housing Project - 4 units
Permit Reviews
Permit Number - TC-RES-0126-00025
Permit Status: Inspections
Permit Description: Middle Housing Project - 4 units
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2026 | RESIDENTIAL NEW DWELLING v.3 | 07/06/2026 | REQUIRES RESUBMIT |
| 08/11/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/13/2026 | APPROVED |
| 02/13/2026 | RESIDENTIAL NEW DWELLING v.3 | 02/23/2026 | APPROVED |
| 06/23/2026 | RESIDENTIAL NEW DWELLING v.2 | 06/30/2026 | REQUIRES RESUBMIT |
| 07/09/2026 | RESIDENTIAL NEW DWELLING v.4 | 07/13/2026 | APPROVED |
| 02/09/2026 | RESIDENTIAL NEW DWELLING v.2 | 02/09/2026 | IN REVIEW |
| 06/03/2026 | RESIDENTIAL NEW DWELLING v.1 | 06/17/2026 | REQUIRES RESUBMIT |
| 01/08/2026 | RESIDENTIAL NEW DWELLING v.1 | 01/22/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0126-00025
Permit Status: Inspections
Permit Description: Middle Housing Project - 4 units
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/13/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 08/20/2026 | Prior to project being finalized applicant must provide proof that translucent windows were installed on the west side of the second floor of the structure per required privacy mitigation measure UDC 4.9.7.B.11. For questions: erick.bieber@tucsonaz.gov |
Conditions
Permit Number - TC-RES-0126-00025
Permit Status: Inspections
Permit Description: Middle Housing Project - 4 units
| Date | Description | Comments |
|---|---|---|
| 01/13/2026 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 01/08/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/12/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/13/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0126-00025
Permite Description: Middle Housing Project - 4 units
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2026 | COT - RSBU - Preslab | N/A | Not Ready | 07/23/2026 Not ready. |
| 08/06/2026 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | |
| 08/13/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 08/13/2026 Interior 5/8" firewall, partial pass pending exterior 5/8". Call in before tape and texture. |
| 08/06/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | |
| COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Requested |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0126-00025
Permit Description: Middle Housing Project - 4 units
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2026 | COT - RSPL - Rough Soil | Passed | 07/23/2026 T's replaced with long sweeps. Holding under test - okay to backfill with shading material. |
|
| 07/23/2026 | COT - RSPL - Sewer | Passed | 07/23/2026 T's replaced with long sweeps. Tracer wire to HCS. Holding under test - okay to backfill with shading material. |
|
| 07/27/2026 | COT - RSBU - Preslab | Passed | 07/27/2026 Approved plan and reinforcements. Added vapor barrier. Okay for concrete placement. |
|
| 07/27/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/11/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 08/13/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 08/13/2026 Corrections made. |