Permit: TC-RES-0125-00439
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6001 E NORTH ST
Address NEW:
6001 E NORTH ST
Apply Date:
01/23/2025
Applicant:
Marytine Ramos
Description:
Installation of Roof mounted 12.30kW PV System with Battery & 225A MPU
Permit Reviews
Permit Number - TC-RES-0125-00439
Permit Status: Complete
Permit Description: Installation of Roof mounted 12.30kW PV System with Battery & 225A MPU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2025 | RESIDENTIAL SOLAR REVISION v.1 | 04/17/2025 | APPROVED |
| 01/24/2025 | RESIDENTIAL SOLAR v.1 | 02/24/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0125-00439
Permit Status: Complete
Permit Description: Installation of Roof mounted 12.30kW PV System with Battery & 225A MPU
| Date | Description | Comments |
|---|---|---|
| 02/11/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00439
Permite Description: Installation of Roof mounted 12.30kW PV System with Battery & 225A MPU
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 200A service panel upgrade, INCR Clearance to TEP is required for the cutover Pending solar |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00439
Permit Description: Installation of Roof mounted 12.30kW PV System with Battery & 225A MPU
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 6.26.26 Solar system is installed per plans. Proper conductors, groundings, neutrals, and labeling all verified via video. |
|
| 06/26/2025 | BULD - Electrical Clearance | Passed | 6.26.26 Solar system is installed per plans. Proper conductors, groundings, neutrals, and labeling all verified via video. |
|
| 06/26/2025 | RSBU - Building Final | Passed | 6.26.26 Solar system is installed per plans. Proper conductors, groundings, neutrals, and labeling all verified via video. |