Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-0125-00439

Parcel: 12101071C


Addresses:

6001 E NORTH ST

Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
04/21/2025 BULD - Electrical Clearance Partial Pass Partial for the 200A service panel upgrade, INCR Clearance to TEP is required for the cutover
Pending solar
06/20/2025 BULD - Electrical Clearance Partial Pass 6.20.25 Partial pass for INCR pending solar - Verbal clearance to TEP
06/26/2025 BULD - Electrical Clearance Passed 6.26.26
Solar system is installed per plans. Proper conductors, groundings, neutrals, and labeling all verified via video.
06/26/2025 BULD - Electrical Clearance Passed 6.26.26
Solar system is installed per plans. Proper conductors, groundings, neutrals, and labeling all verified via video.