Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade, INCR Clearance to TEP is required for the cutover Pending solar |
|
| 06/20/2025 | BULD - Electrical Clearance | Partial Pass | 6.20.25 Partial pass for INCR pending solar - Verbal clearance to TEP | |
| 06/26/2025 | BULD - Electrical Clearance | Passed | 6.26.26 Solar system is installed per plans. Proper conductors, groundings, neutrals, and labeling all verified via video. |
|
| 06/26/2025 | BULD - Electrical Clearance | Passed | 6.26.26 Solar system is installed per plans. Proper conductors, groundings, neutrals, and labeling all verified via video. |