Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
5042 S GREENWAY DR
Apply Date:
01/16/2025
Applicant:
Marytine Ramos
Description:
Installation of Roof mounted 7.38kW Pv System with Existing system V1 Tesla to Enphase

Permit Reviews

Permit Number - TC-RES-0125-00282
Permit Status: Complete
Permit Description: Installation of Roof mounted 7.38kW Pv System with Existing system V1 Tesla to Enphase
Start Date Submittal Complete Date Status  
01/16/2025 RESIDENTIAL SOLAR v.1 02/14/2025 APPROVED Review Details
04/29/2025 RESIDENTIAL SOLAR REVISION v.1 05/16/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0125-00282
Permit Description: Installation of Roof mounted 7.38kW Pv System with Existing system V1 Tesla to Enphase
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/24/2025 BULD - Electrical Clearance Passed 6.24.25 Solar system installed per plans. Correct gauged wires verified. Panel verified. Address label present. Grounding, bonding, neutrals verified. Labels on conduits every 10 ft verified. Labels on panels verified. Proper mounting hardware as per plan observed at arrays on roof.
06/24/2025 RSBU - Building Final Passed 6.24.25 Solar system installed per plans. Correct gauged wires verified. Panel verified. Address label present. Grounding, bonding, neutrals verified. Labels on conduits every 10 ft verified. Labels on panels verified. Proper mounting hardware as per plan observed at arrays on roof.
06/24/2025 COT - RSOL - Electrical Final Solar Project Passed 6.24.25 Solar system installed per plans. Correct gauged wires verified. Panel verified. Address label present. Grounding, bonding, neutrals verified. Labels on conduits every 10 ft verified. Labels on panels verified. Proper mounting hardware as per plan observed at arrays on roof.