Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2025 | COT - RSOL - Electrical Final Solar Project | Not Ready | ||
| 04/24/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | 4/24/25 Panel main breaker not per plan. Please request Electrical Clearance on the next inspection as well. |
|
| 05/23/2025 | COT - RSOL - Electrical Final Solar Project | Canceled | Canceled per contractor. 5/22/2025 | |
| 06/02/2025 | COT - RSOL - Electrical Final Solar Project | Canceled | ||
| 06/05/2025 | COT - RSOL - Electrical Final Solar Project | Canceled | ||
| 06/24/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 6.24.25 Solar system installed per plans. Correct gauged wires verified. Panel verified. Address label present. Grounding, bonding, neutrals verified. Labels on conduits every 10 ft verified. Labels on panels verified. Proper mounting hardware as per plan observed at arrays on roof. |