Permit: TC-RES-0125-00048
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1911 S AMALIA AV
Address NEW:
1911 S AMALIA AV
Apply Date:
01/05/2025
Applicant:
JACKIE BEHRENDS
Description:
Water heater and washer and dryer moved outside. Dryer was changed from gas to electrical and moved outside.
Permit Reviews
Permit Number - TC-RES-0125-00048
Permit Status: Complete
Permit Description: Water heater and washer and dryer moved outside. Dryer was changed from gas to electrical and moved outside.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/10/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 01/10/2025 | REQUIRES RESUBMIT |
| 01/06/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 01/06/2025 | REQUIRES RESUBMIT |
| 02/03/2025 | RESIDENTIAL SIMPLE REVIEW v.5 | 02/03/2025 | APPROVED |
| 01/27/2025 | RESIDENTIAL SIMPLE REVIEW v.3 | 01/27/2025 | REQUIRES RESUBMIT |
| 01/28/2025 | RESIDENTIAL SIMPLE REVIEW v.4 | 01/28/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0125-00048
Permit Status: Complete
Permit Description: Water heater and washer and dryer moved outside. Dryer was changed from gas to electrical and moved outside.
| Date | Description | Comments |
|---|---|---|
| 01/06/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00048
Permit Description: Water heater and washer and dryer moved outside. Dryer was changed from gas to electrical and moved outside.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2025 | COT - BULD - SWG Clearance | Passed | 2/6/25 approval for SWG clearance | |
| 02/07/2025 | COT - RSME - Mechanical Final | Passed | 2/7/25 pass | |
| 02/11/2025 | COT - RSEL - Electrical Final | Passed | ||
| 02/11/2025 | COT - RSPL - Plumbing Final | Passed |