Permit: TC-RES-0124-00417
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
1501 S SAINT TROPAZ PL
Address NEW:
1501 S SAINT TROPAZ PL
Apply Date:
01/24/2024
Applicant:
Adam Lundquist
Description:
Remodel SFR
Permit Reviews
Permit Number - TC-RES-0124-00417
Permit Status: Inspections complete
Permit Description: Remodel SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/11/2024 | RESIDENTIAL NEW DWELLING v.1 | 05/13/2024 | APPROVED |
| 01/25/2024 | RESIDENTIAL NEW DWELLING v.1 | 02/16/2024 | APPROVED |
| 08/14/2024 | RESIDENTIAL NEW DWELLING REVISION v.1 | 09/12/2024 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0124-00417
Permite Description: Remodel SFR
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2024 | RSBU - Building Final | N/A | Re-inspection required | 7/25/24: gutters must be completed, Light fixtures must be installed, door bell must be installed, kitchen Circuit 31 keeps tripping at breaker, light switch at entry not working properly, entry receptacle missing per plans, exhaust fans in bathroom not functioning properly, receptacles missing at kitchen, kitchen wiring not complete, high loop at dishwasher not properly installed, water hammer arrestor missing at dishwasher, receptacle at water heater must be GFCI, garage receptacles must be GFCI, vacuum breaker at hose bib missing, wiring by electrical panel not made up, no roof access, exterior garage lights missing, revision must be sent in to show that sub panel was eliminated. egress at windows not met (fixed windows at bedrooms) |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0124-00417
Permit Description: Remodel SFR
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 4/2/2024 | |
| 04/02/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 4/2/2024 | |
| 04/02/2024 | RSPL - Plumbing Progress | Passed | ||
| 04/02/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 4/2/2024 | |
| 05/02/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP INCR. Okay for cut over. 5/2/2024 | |
| 05/02/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/16/2024 | COT - RSPL - Gas Pressure Test | Passed | 5/16/24: gas pressure test passed. Ok to backfill. Shading required. | |
| 05/31/2024 | COT - RSBU - Roof Nailing | Passed | 5/31/24: roof nailing per plan ok to dry-in | |
| 06/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/25/2024 | COT - BULD - SWG Clearance | Passed | 5/16/24: not ready. wanted gas pressure test. 7/25/24: SWG Clearance |
|
| 07/25/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/18/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 09/18/2024 | RSBU - Building Final | Passed | OK to occupy single family residence | |
| 09/18/2024 | COT - RSEL - Electrical Final | Passed | ||
| 09/18/2024 | COT - RSME - Mechanical Final | Passed | Pool company to request gas meter for pool heater. Gas bonding is complete. |