Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address NEW:
1501 S SAINT TROPAZ PL
Apply Date:
01/24/2024
Applicant:
Adam Lundquist
Description:
Remodel SFR

Permit Reviews

Permit Number - TC-RES-0124-00417
Permit Status: Inspections complete
Permit Description: Remodel SFR
Start Date Submittal Complete Date Status  
04/11/2024 RESIDENTIAL NEW DWELLING v.1 05/13/2024 APPROVED Review Details
01/25/2024 RESIDENTIAL NEW DWELLING v.1 02/16/2024 APPROVED Review Details
08/14/2024 RESIDENTIAL NEW DWELLING REVISION v.1 09/12/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0124-00417
Permite Description: Remodel SFR
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/25/2024 RSBU - Building Final N/A Re-inspection required 7/25/24: gutters must be completed, Light fixtures must be installed, door bell must be installed, kitchen Circuit 31 keeps tripping at breaker, light switch at entry not working properly, entry receptacle missing per plans, exhaust fans in bathroom not functioning properly, receptacles missing at kitchen, kitchen wiring not complete, high loop at dishwasher not properly installed, water hammer arrestor missing at dishwasher, receptacle at water heater must be GFCI, garage receptacles must be GFCI, vacuum breaker at hose bib missing, wiring by electrical panel not made up, no roof access, exterior garage lights missing, revision must be sent in to show that sub panel was eliminated. egress at windows not met (fixed windows at bedrooms)

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0124-00417
Permit Description: Remodel SFR
Total Completed Inspections - 15
Date Description Inspector Results Comments
04/02/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 4/2/2024
04/02/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required. 4/2/2024
04/02/2024 RSPL - Plumbing Progress Passed
04/02/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 4/2/2024
05/02/2024 BULD - Electrical Clearance Passed Clearance for TEP INCR. Okay for cut over. 5/2/2024
05/02/2024 COT - RSEL - Grounding/Bonding Passed
05/16/2024 COT - RSPL - Gas Pressure Test Passed 5/16/24: gas pressure test passed. Ok to backfill. Shading required.
05/31/2024 COT - RSBU - Roof Nailing Passed 5/31/24: roof nailing per plan ok to dry-in
06/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/25/2024 COT - BULD - SWG Clearance Passed 5/16/24: not ready. wanted gas pressure test.
7/25/24: SWG Clearance
07/25/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/18/2024 COT - RSPL - Plumbing Final Passed
09/18/2024 RSBU - Building Final Passed OK to occupy single family residence
09/18/2024 COT - RSEL - Electrical Final Passed
09/18/2024 COT - RSME - Mechanical Final Passed Pool company to request gas meter for pool heater. Gas bonding is complete.

Documents

File Name Document Type  
CONS-3_PLAN SET_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V1.PDF DOCUMENTS VIEW
REVISION LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW