Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
4898 E CECELIA ST
Apply Date:
01/08/2024
Applicant:
Franco Chimienti
Description:
ADU

Permit Reviews

Permit Number - TC-RES-0124-00117
Permit Status: Complete
Permit Description: ADU
Start Date Submittal Complete Date Status  
03/04/2024 RESTAMP - RESIDENTIAL v.1 03/05/2024 APPROVED Review Details
05/01/2024 RESIDENTIAL NEW DWELLING v.1 05/01/2024 REQUIRES RESUBMIT Review Details
03/04/2024 RESIDENTIAL NEW DWELLING v.3 03/04/2024 APPROVED Review Details
02/09/2024 RESIDENTIAL NEW DWELLING v.2 03/04/2024 REQUIRES RESUBMIT Review Details
01/08/2024 RESIDENTIAL NEW DWELLING v.1 02/01/2024 REQUIRES RESUBMIT Review Details
05/20/2024 RESIDENTIAL NEW DWELLING v.2 06/18/2024 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0124-00117
Permit Description: ADU
Total Completed Inspections - 16
Date Description Inspector Results Comments
04/01/2024 COT - RSEL - Electrical Underground Passed
04/01/2024 COT - RSPL - Yard Water Line Passed
04/03/2024 COT - RSPL - Rough Soil Passed
04/04/2024 COT - RSEL - Grounding/Bonding Passed
04/04/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/10/2024 COT - RSBU - Masonry Pregrout Passed Masonry wall is built to 8' height, contractor has cut weep holes at bottom of wall for inspection of rebar reinforcement and ensure that the grout goes all the way to the bottom of the wall. Okay to proceed with grout placement.
04/22/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4/22/24: Exterior walls are properly framed, plywood sheathing is properly nailed off, roof joists are nailed to top plate and H2.5 clips are properly installed and secured to top plate. Okay to dry-in exterior walls and roof.
04/22/2024 COT - RSBU - Roof Nailing Passed 4/22/24: Exterior walls are properly framed, plywood sheathing is properly nailed off, roof joists are nailed to top plate and H2.5 clips are properly installed and secured to top plate. Okay to dry-in exterior walls and roof.
05/23/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/08/2024 BULD - Electrical Clearance Passed Ok to.set meter and energize system.
09/12/2024 RSBU - Building Final Passed
09/12/2024 COT - RSEL - Electrical Final Passed
09/12/2024 COT - RSEL - Outdoor Lighting Passed
09/12/2024 COT - RSME - Mechanical Final Passed
09/12/2024 COT - RSPL - Plumbing Final Passed
09/12/2024 COT - RSBU - Preslab Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SKINNER ADU 05152024 FULL SET REVISED V_2_V2.PDF DOCUMENTS VIEW
SKINNER REVISION LETTER TC-RES-0124-00117_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-SKINNER ADU 02292024 FULL SET REVISED_V3_V1.PDF DOCUMENTS VIEW
CONS-SKINNER ADU 02292024 FULL SET REVISED_V3.PDF DOCUMENTS VIEW