Permit: TC-RES-0123-02257
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2060 W PROBASCO DR
Address NEW:
2060 W PROBASCO DR
Apply Date:
01/19/2023
Applicant:
Inai Maldonado
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0123-02257
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/04/2023 | RESIDENTIAL NEW DWELLING v.2 | 05/17/2023 | REQUIRES RESUBMIT |
| 06/13/2023 | RESTAMP - RESIDENTIAL v.1 | 06/15/2023 | APPROVED |
| 06/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/07/2024 | APPROVED |
| 02/28/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/23/2023 | REQUIRES RESUBMIT |
| 06/08/2023 | RESIDENTIAL NEW DWELLING v.3 | 06/13/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0123-02257
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 06/15/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 06/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02257
Permite Description: SFR
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Applicable | |
| 05/17/2024 | COT - FCON - Sprinkler - Final | N/A | Partial Pass | Bell did not ring. |
| 06/12/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/23/2023 | COT - RSPL - Gas Pressure Test | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02257
Permit Description: SFR
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2023 | COT - RSBU - Preslab | Passed | ||
| 09/15/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 02/01/2024 | COT - RSPL - Gas Final | Passed | ||
| 04/04/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/17/2024 | COT - RSEL - Electrical Final | Passed | 4/4/24: Address missing at house, Vacuum breaker missing at hose bibs, electrical fixtures on exterior need to be made up, sprinkler system not hooked up, Water meter not installed at time of inspection, hose bibs need to be properly insulated and wrapped for up protection, clean outs need to be capped and cut to grade, Dining room breaker must be ARC-FAULT, Kitchen breakers must be ARC-FAULT, piping on exterior of house needs to be coated for UV protection, GFCI at laundry not functioning properly. water hammer arrestor missing throughout, bathroom Receptacles need to be GFCI, Receptacle under kitchen sink must be GFCI, HVAC drain line must be UV coated, Main door not installed at time of final inspection. No ladder for attic access. 5/17/24: corrections made. |
|
| 05/17/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/17/2024 | COT - RSME - Mechanical Final | Passed | 4/4/24: Address missing at house, Vacuum breaker missing at hose bibs, electrical fixtures on exterior need to be made up, sprinkler system not hooked up, Water meter not installed at time of inspection, hose bibs need to be properly insulated and wrapped for up protection, clean outs need to be capped and cut to grade, Dining room breaker must be ARC-FAULT, Kitchen breakers must be ARC-FAULT, piping on exterior of house needs to be coated for UV protection, GFCI at laundry not functioning properly. water hammer arrestor missing throughout, bathroom Receptacles need to be GFCI, Receptacle under kitchen sink must be GFCI, HVAC drain line must be UV coated, Main door not installed at time of final inspection. No ladder for attic access. 5/17/24: corrections made. |
|
| 05/17/2024 | COT - RSPL - Plumbing Final | Passed | 4/4/24: Address missing at house, Vacuum breaker missing at hose bibs, electrical fixtures on exterior need to be made up, sprinkler system not hooked up, Water meter not installed at time of inspection, hose bibs need to be properly insulated and wrapped for up protection, clean outs need to be capped and cut to grade, Dining room breaker must be ARC-FAULT, Kitchen breakers must be ARC-FAULT, piping on exterior of house needs to be coated for UV protection, GFCI at laundry not functioning properly. water hammer arrestor missing throughout, bathroom Receptacles need to be GFCI, Receptacle under kitchen sink must be GFCI, HVAC drain line must be UV coated, Main door not installed at time of final inspection. No ladder for attic access. 5/17/24: corrections made. |
|
| 06/12/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/12/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/12/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 06/12/2024 | COT - RSPL - Rough Soil | Passed | ||
| 06/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 06/12/2024 | RSBU - Building Final | Passed |