Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1224-01409
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
7342 S DEMPSEY AV
Address NEW:
7342 S DEMPSEY AV
Apply Date:
10/02/2025
Applicant:
Celina Rodriguez
Description:
KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Permit Reviews
Permit Number - TC-MDP-1224-01409
Permit Status: Inspections
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/02/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/14/2025 | APPROVED |
| 10/14/2025 | ADMINISTRATIVE v.1 | 10/14/2025 | REQUIRES RESUBMIT |
| 10/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/16/2025 | APPROVED |
| 10/14/2025 | ADMINISTRATIVE v.2 | 10/14/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1224-01409
Permit Status: Inspections
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/02/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/02/2025 | Post-Installed Anchor Inspection Report is required. |
| 10/02/2025 | Post-Tension Inspection Report is required. |
| 10/02/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
| 12/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-1224-01409
Permit Status: Inspections
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
| Date | Description | Comments |
|---|---|---|
| 12/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/16/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1224-01409
Permite Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 11/25/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1224-01409
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2025 | COT - RSPL - Yard Water Line | Passed | 10.21.2025 Approved and holding under test ok to backfill with shading materials. |
|
| 10/21/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 10/22/2025 | COT - RSPL - Rough Soil | Passed | 10.22.225 Approved, okay to backfill with shading materials. |
|
| 10/22/2025 | COT - RSPL - Sewer | Passed | 10.22.225 Approved, okay to backfill with shading materials. |
|
| 10/27/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10.27.2025 Approved per plan, verified setbacks. |
|
| 10/27/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 10/27/2025 | COT - RSBU - Preslab | Passed | 10.27.2025 Approved per plan, okay for concrete placement. |
|
| 11/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11/13/25 corrections made | |
| 11/13/2025 | COT - RSBU - Roof Nailing | Passed | 11/13/25 corrections made | |
| 11/25/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11.25.2025 Approved, added bracing midway to ABS pipe in powder room, grounded metal light box, and added Boca nail plates to DWV pipe upstairs. |
|
| 11/25/2025 | BULD - Electrical Clearance | Passed | 11.25.2025 Clearance for TEP ECO. |
|
| 12/03/2025 | COT - RSBU - Interior Shear Bracing | Passed |