Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7334 S DEMPSEY AV
Apply Date:
06/05/2025
Applicant:
Celina Rodriguez
Description:
KB Home 2467 (Model master plan TC-MDP-1124-01304)

Permit Reviews

Permit Number - TC-MDP-1224-01402
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Start Date Submittal Complete Date Status  
06/09/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/16/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1224-01402
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Activity Conditions - 5
Date Name
06/11/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/11/2025 Post-Installed Anchor Inspection Report is required.
06/11/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/11/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
12/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1224-01402
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Date Description Comments
12/20/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01402
Permite Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/08/2025 COT - BULD - SWG Clearance N/A Not Applicable 10-8-25: not applicable.
10/08/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable 10-8-25: not applicable.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01402
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Completed Inspections - 20
Date Description Inspector Results Comments
07/03/2025 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading material is required. 7/3/2025
07/03/2025 COT - RSPL - Sewer Passed Okay to backfill. Shading material is required. 7/3/2025
07/03/2025 COT - RSPL - Rough Soil Passed Okay to backfill. Shading material is required. 7/3/2025
07/03/2025 COT - RSPL - Backwater Valve Passed Okay to backfill. Shading material is required. 7/3/2025
07/15/2025 COT - RSBU - Preslab Passed Passed 7/15/25 ok to pour concrete
07/15/2025 COT - RSEL - Electrical Underground Passed Passed 7/15/25 ok to pour concrete
07/15/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 7/15/25 ok to pour concrete
07/24/2025 COT - RSBU - Roof Nailing Passed 7.24.25
Passed
07/25/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 7/25/25
Pass
08/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 8/14/25
08/14/2025 BULD - Electrical Clearance Passed Ready for temp power clearance ECO
08/20/2025 COT - RSEL - Grounding/Bonding Passed 8.20.25
Passed
08/21/2025 COT - RSBU - Interior Shear Bracing Passed 8.21.25
APPROVED
10/08/2025 COT - RSEL - Outdoor Lighting Passed 10-8-25: approved.
10/08/2025 COT - RSME - Mechanical Final Passed 10-8-25: approved.
10/08/2025 RSBU - Building Progress Passed 10-8-25: approved.
10/14/2025 COT - RSEL - Electrical Final Passed
10/14/2025 COT - RSPL - Plumbing Final Passed
10/15/2025 ENGR Engineering Final Passed site is complete in accordance with approved plans.
10/16/2025 RSBU - Building Final Passed