Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6490 E PASEO ALGA
Apply Date:
05/23/2025
Applicant:
Brianna Quiroz
Description:
490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00051)

Permit Reviews

Permit Number - TC-MDP-1224-01390
Permit Status: Complete
Permit Description: 490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00051)
Start Date Submittal Complete Date Status  
06/23/2025 RESTAMP - RESIDENTIAL v.1 06/25/2025 APPROVED Review Details
06/09/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.2 06/18/2025 REQUIRES RESUBMIT Review Details
06/23/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.3 06/23/2025 APPROVED Review Details
05/29/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/29/2025 REQUIRES RESUBMIT Review Details
12/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/29/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1224-01390
Permit Status: Complete
Permit Description: 490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00051)
Date Description Comments
06/10/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/20/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/10/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/10/2025 Post-Installed Anchor Inspection Report is required.
12/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
06/10/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
06/10/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
12/29/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1224-01390
Permite Description: 490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00051)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
08/14/2025 COT - BULD - SWG Clearance N/A Not Applicable N/A
08/14/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
09/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Whole house missing fire caulking.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1224-01390
Permit Description: 490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00051)
Total Completed Inspections - 19
Date Description Inspector Results Comments
08/14/2025 COT - RSEL - Electrical Underground Passed
08/14/2025 COT - RSPL - Rough Soil Passed
08/14/2025 COT - RSPL - Sewer Passed
08/14/2025 COT - RSPL - Yard Water Line Passed
08/19/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 8.19.25
APPROVED
08/19/2025 COT - RSBU - Preslab Passed 8.19.25
APPROVED
09/02/2025 COT - RSBU - Roof Nailing Passed
09/05/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 9.52025
Corrections made from prior inspection, verified with letter that mechanical connection on roof girder truss at JG1 to B1G is correct with heel and nails.
09/25/2025 BULD - Electrical Clearance Passed 9/25/25
TEP CLEARANCE: ECO
09/25/2025 COT - RSEL - Grounding/Bonding Passed
09/26/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/10/2025 COT - RSBU - Interior Shear Bracing Passed
01/21/2026 COT - RSEL - Electrical Final Passed
01/21/2026 COT - RSEL - Outdoor Lighting Passed
01/21/2026 COT - RSME - Mechanical Final Passed
01/21/2026 COT - RSPL - Plumbing Final Passed
01/21/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
01/21/2026 RSBU - Building Final Passed
01/21/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 39 FINAL SIC-2025-12-23_V1.PDF DOCUMENTS VIEW
SOILS REPORT_V1.PDF DOCUMENTS VIEW
Z490 INDIANA DUNES TRUSS CALCS R1 (2025)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 39 RE-SUBMIT_V3.PDF DOCUMENTS VIEW