Permit: TC-MDP-1224-01371
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
544 E LIMBERLOST DR BLDG 3
Address NEW:
544 E LIMBERLOST DR BLDG 3
Apply Date:
12/04/2024
Applicant:
David Garcia
Description:
Limberlost 4plex 4400 (Model master plan TC-MDP-0224-00161)
Permit Reviews
Permit Number - TC-MDP-1224-01371
Permit Status: Complete
Permit Description: Limberlost 4plex 4400 (Model master plan TC-MDP-0224-00161)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/27/2025 | REQUIRES RESUBMIT |
| 08/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/01/2025 | REQUIRES RESUBMIT |
| 01/28/2025 | COMMERCIAL REVIEW - FULL v.2 | 01/31/2025 | REQUIRES RESUBMIT |
| 07/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 07/15/2025 | APPROVED |
| 12/19/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/13/2025 | REQUIRES RESUBMIT |
| 07/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/03/2025 | REQUIRES RESUBMIT |
| 09/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/05/2025 | APPROVED |
| 08/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 08/08/2025 | REQUIRES RESUBMIT |
| 02/05/2025 | COMMERCIAL REVIEW - FULL v.3 | 02/11/2025 | APPROVED |
| 07/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2025 | REQUIRES RESUBMIT |
| 02/11/2025 | RESTAMP - COMMERCIAL v.1 | 02/13/2025 | APPROVED |
| 06/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/09/2025 | REQUIRES RESUBMIT |
| 08/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 08/14/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1224-01371
Permit Status: Complete
Permit Description: Limberlost 4plex 4400 (Model master plan TC-MDP-0224-00161)
| Date | Description | Comments |
|---|---|---|
| 12/06/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 12/06/2024 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 12/06/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/06/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
| 12/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 12/06/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 12/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 12/06/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1224-01371
Permite Description: Limberlost 4plex 4400 (Model master plan TC-MDP-0224-00161)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/08/2025 | COT - LCPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1224-01371
Permit Description: Limberlost 4plex 4400 (Model master plan TC-MDP-0224-00161)
Total Completed Inspections - 27