Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
03/29/2024
Applicant:
Dana Petty
Description:
SFR MER2302690 T21-M0069 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-1223-01920
Permit Status: Issued
Permit Description: SFR MER2302690 T21-M0069 REV1 roof covering change
Start Date Submittal Complete Date Status  
04/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/08/2024 APPROVED Review Details
08/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1223-01920
Permit Status: Issued
Permit Description: SFR MER2302690 T21-M0069 REV1 roof covering change
Date Description Comments
04/04/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/04/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/04/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/04/2024 Post-Tension Inspection Report is required.
12/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
04/04/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-1223-01920
Permite Description: SFR MER2302690 T21-M0069 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/13/2024 RSBU - Building Progress N/A Canceled 9/13/24: canceled per contractor

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1223-01920
Permit Description: SFR MER2302690 T21-M0069 REV1 roof covering change
Total Completed Inspections - 13
Date Description Inspector Results Comments
06/25/2024 COT - RSPL - Sewer Passed
06/25/2024 COT - RSPL - Yard Water Line Passed
06/25/2024 COT - RSPL - Rough Soil Passed
07/03/2024 COT - RSBU - Preslab Passed Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab.
07/03/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab.
07/03/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab.
07/03/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab.
08/05/2024 COT - RSBU - Exterior Clips/Sheathing Passed Exterior shear walls are properly framed, secured to the concrete floor with j-bolts, titan bolts, cut nails, or masa clips; plywood sheathing is properly nailed to the studs per plan specifications. Interior walls are properly secured to concrete floor with cut nails, titan bolts, shot pins, or red heads. All header beams are properly strapped to support studs. Okay to proceed with rough-in of plumbing, mechanical, and electrical work.
08/05/2024 COT - RSBU - Roof Nailing Passed All floor joists and roof trusses are properly installed and secured to the top plate of the exterior walls with nails and H2.5 clips. Floor and roof sheathing is secured to the joists and trusses with nails per plan and code requirements. Okay to proceed with mechanical, electrical, and plumbing rough-in work.
09/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation.
09/06/2024 COT - RSPL - Gas Pressure Test Passed Gas line is properly installed and under 15 psi of air pressure with no leaks. Okay to proceed.
09/11/2024 BULD - Electrical Clearance Passed
09/23/2024 COT - RSBU - Interior Shear Bracing Passed Passed shear bracing inspection 9/23/24

Documents

File Name Document Type  
148683 PT LOT 188 COMPLETE-2024-08-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 188 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 188 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 188 SPECIAL INSPECTION CERTIFICATE-2024-03-29_V1.PDF DOCUMENTS VIEW