Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1223-01920
Permit Details
Apply Date:
03/29/2024
Applicant:
Daria Hopkins
Description:
SFR MER2302690 T21-M0069 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-1223-01920
Permit Status: Complete
Permit Description: SFR MER2302690 T21-M0069 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/08/2024 | APPROVED |
08/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1223-01920
Permit Status: Complete
Permit Description: SFR MER2302690 T21-M0069 REV1 roof covering change
Date | Description | Comments |
---|---|---|
04/04/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/04/2024 | Post-Tension Inspection Report is required. | |
12/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
04/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01920
Permite Description: SFR MER2302690 T21-M0069 REV1 roof covering change
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2024 | RSBU - Building Progress | N/A | Canceled | 9/13/24: canceled per contractor |
11/18/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 11-18-24, missing post tension tag on hose bib, thermostats must be no higher than 54 inches, and provide ladder for attic access. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01920
Permit Description: SFR MER2302690 T21-M0069 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/25/2024 | COT - RSPL - Sewer | Passed | ||
06/25/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/25/2024 | COT - RSPL - Rough Soil | Passed | ||
07/03/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab. | |
07/03/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab. | |
07/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab. | |
07/03/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab. | |
08/05/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior shear walls are properly framed, secured to the concrete floor with j-bolts, titan bolts, cut nails, or masa clips; plywood sheathing is properly nailed to the studs per plan specifications. Interior walls are properly secured to concrete floor with cut nails, titan bolts, shot pins, or red heads. All header beams are properly strapped to support studs. Okay to proceed with rough-in of plumbing, mechanical, and electrical work. | |
08/05/2024 | COT - RSBU - Roof Nailing | Passed | All floor joists and roof trusses are properly installed and secured to the top plate of the exterior walls with nails and H2.5 clips. Floor and roof sheathing is secured to the joists and trusses with nails per plan and code requirements. Okay to proceed with mechanical, electrical, and plumbing rough-in work. | |
09/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation. | |
09/06/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is properly installed and under 15 psi of air pressure with no leaks. Okay to proceed. | |
09/11/2024 | BULD - Electrical Clearance | Passed | ||
09/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | Passed shear bracing inspection 9/23/24 | |
11/08/2024 | COT - BULD - SWG Clearance | Passed | SWG CLEARANCE ISSUED. | |
11/18/2024 | COT - RSEL - Outdoor Lighting | Passed | 11-18-24, approved. | |
11/26/2024 | RSBU - Building Progress | Passed | ||
11/26/2024 | COT - RSPL - Plumbing Final | Passed | Corrections were made. Approved. 11/26/2024 | |
11/26/2024 | COT - RSME - Mechanical Final | Passed | Corrections were made. Approved. 11/26/2024 | |
11/26/2024 | COT - RSEL - Electrical Final | Passed | Corrections were made. Approved. 11/26/2024 | |
11/26/2024 | RSBU - Building Final | Passed | Corrections were made. Approved. 11/26/2024 | |
12/10/2024 | ENGR Engineering Final | Passed |