Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 08/05/2024 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Passed |
Exterior shear walls are properly framed, secured to the concrete floor with j-bolts, titan bolts, cut nails, or masa clips; plywood sheathing is properly nailed to the studs per plan specifications. Interior walls are properly secured to concrete floor with cut nails, titan bolts, shot pins, or red heads. All header beams are properly strapped to support studs. Okay to proceed with rough-in of plumbing, mechanical, and electrical work. |