Permit: TC-MDP-1223-01918
Permit Details
Apply Date:
12/28/2023
Applicant:
Daria Hopkins
Description:
SFR 135.2110 T21-M0053
Permit Reviews
Permit Number - TC-MDP-1223-01918
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/29/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/04/2024 | APPROVED |
07/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/24/2024 | APPROVED |
10/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/11/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1223-01918
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Date | Description | Comments |
---|---|---|
12/29/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
12/29/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/03/2024 | Post-Tension Inspection Report is required. | |
12/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/29/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
12/29/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01918
Permite Description: SFR 135.2110 T21-M0053
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/10/2024 | COT - BULD - SWG Clearance | N/A | Re-inspection required | Water heater not installed, no shut off valve 9/10/2024 |
09/20/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 9-20-2024, paint PTR line to protect from sunlight and cut greywater cleanouts to grade. |
09/20/2024 | RSBU - Building Final | N/A | Re-inspection required | 9-20-2024, cut to grade greywater cleanouts and paint PTR line (t & p line) to protect against sunlight. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01918
Permit Description: SFR 135.2110 T21-M0053
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/24/2024 | COT - RSPL - Rough Soil | Passed | ||
05/24/2024 | COT - RSPL - Sewer | Passed | ||
05/24/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6/3/24: reinforcement and PT per plans ok to proceed. | |
06/03/2024 | COT - RSBU - Preslab | Passed | 6/3/24: reinforcement and PT per plans ok to proceed. | |
06/03/2024 | COT - RSEL - Electrical Underground | Passed | 6/3/24: reinforcement and PT per plans ok to proceed. | |
06/03/2024 | COT - RSEL - Grounding/Bonding | Passed | 6/3/24: reinforcement and PT per plans ok to proceed. | |
06/17/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/20/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/02/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 7/2/2024 | |
07/11/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/18/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 9/18/2024 | |
09/20/2024 | COT - RSEL - Electrical Final | Passed | 9-20-2024, All electrical inspected and approved. | |
09/20/2024 | COT - RSEL - Outdoor Lighting | Passed | 9-20-2024,all outdoor lighting fixtures and receptacles tested and approved. | |
09/20/2024 | COT - RSME - Mechanical Final | Passed | 9-20-2024, mechanical final approved. | |
09/20/2024 | RSBU - Building Progress | Passed | ||
09/26/2024 | COT - RSPL - Plumbing Final | Passed | Corrections were made. 9/26/2024 | |
09/26/2024 | RSBU - Building Final | Passed | Corrections were made. 9/26/2024 | |
09/27/2024 | ENGR Engineering Final | Passed | CO ready. A determination still needs to be made on weep holes transferring water on to adjoining property. |