Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 07/05/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
Lath incomplete and roof not loaded. Not ready. 7/5/2024 |
| 07/11/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
DWV not on test. Add nail plates to both electrical and plumbing lines where marked. Move smoke detector in master bedroom 3' from bathroom entry. Secure T STAT wires. Secure condensation line. Missing receptacle at garage entry to the right according to plans. Add straps or nail plate to exhaust hood. Lighting and receptacles incomplete in attic. 7/11/2024 |
| 07/15/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
DWV not on test. Rfi on receptacle in garage entry? Electrical conduit in kitchen not protected. Blocking at registers missing. 7/15/2024 |
| 07/17/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|