Permit: TC-MDP-1223-01912
Permit Details
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-1223-01912
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2024 | APPROVED |
01/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/11/2024 | APPROVED |
06/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/28/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1223-01912
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
01/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/09/2024 | Post-Tension Inspection Report is required. | |
01/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/28/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01912
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/12/2024 | COT - RSPL - Sewer | Passed | ||
04/12/2024 | COT - RSPL - Rough Soil | Passed | ||
04/12/2024 | COT - RSPL - Backwater Valve | Passed | ||
05/06/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, masa clips are spaced properly, shear wall clips are in place per plans, rebar reinforcement is in place per plans, post tension cabling is installed and properly spaced per plans, plumbing pipes are properly wrapped with foam for protection, underground electrical for kitchen island is installed, and Ufer ground is installed on right side of garage. Okay to pour concrete for footings and slab on grade. | |
05/06/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, masa clips are spaced properly, shear wall clips are in place per plans, rebar reinforcement is in place per plans, post tension cabling is installed and properly spaced per plans, plumbing pipes are properly wrapped with foam for protection, underground electrical for kitchen island is installed, and Ufer ground is installed on right side of garage. Okay to pour concrete for footings and slab on grade. | |
05/06/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, masa clips are spaced properly, shear wall clips are in place per plans, rebar reinforcement is in place per plans, post tension cabling is installed and properly spaced per plans, plumbing pipes are properly wrapped with foam for protection, underground electrical for kitchen island is installed, and Ufer ground is installed on right side of garage. Okay to pour concrete for footings and slab on grade. | |
05/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, masa clips are spaced properly, shear wall clips are in place per plans, rebar reinforcement is in place per plans, post tension cabling is installed and properly spaced per plans, plumbing pipes are properly wrapped with foam for protection, underground electrical for kitchen island is installed, and Ufer ground is installed on right side of garage. Okay to pour concrete for footings and slab on grade. | |
05/17/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior wall sheathing is properly installed and secured to the studs per plans and code. Bottom plates are secured to the concrete floor with masa clips or a/b bolts. Shear wall clips are properly secured to studs with nails and all large headers are properly secured with straps and nails. Okay to proceed. | |
05/17/2024 | COT - RSBU - Roof Nailing | Passed | All trusses are properly secured to top plate with nails and H2.5 clips. All plywood sheathing is properly secured to trusses with nails per plans and code. Okay to proceed. | |
06/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
06/10/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is installed and holding 15# of compressed air. Okay to proceed. | |
06/10/2024 | BULD - Electrical Clearance | Passed | Electrical panel, breakers, and temporary GFCI outlet are installed. Issuing an ECO Clearance to TEP to energize electrical system. | |
06/10/2024 | RSBU - Building Progress | Passed | Gas line is installed and holding 15# of compressed air. Okay to proceed. Mechanical, electrical, and plumbing rough-in is complete. Roof dry-in is complete. Foam and lathe for stucco is properly secured to exterior walls. | |
07/08/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/22/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
08/22/2024 | COT - RSEL - Electrical Final | Passed | ||
08/22/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/22/2024 | COT - RSME - Mechanical Final | Passed | ||
08/27/2024 | COT - RSPL - Plumbing Final | Passed | ||
08/27/2024 | ENGR Engineering Final | Passed | ||
08/27/2024 | RSBU - Building Final | Passed |