Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
3075 N SIBLEY MINE RD
Apply Date:
06/04/2024
Applicant:
Description:
SFR K35D T21-M0032

Permit Reviews

Permit Number - TC-MDP-1223-01903
Permit Status: Inspections complete
Permit Description: SFR K35D T21-M0032
Start Date Submittal Complete Date Status  
06/04/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 06/05/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1223-01903
Permit Status: Inspections complete
Permit Description: SFR K35D T21-M0032
Total Outstanding Activity Conditions - 3
Date Name
06/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/05/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-1223-01903
Permit Status: Inspections complete
Permit Description: SFR K35D T21-M0032
Date Description Comments
12/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/08/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1223-01903
Permite Description: SFR K35D T21-M0032
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/15/2024 COT - RSEL - Grounding/Bonding N/A Partial Pass
09/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 9/3/24: fire blocking required at garage by main panel, exterior light fixture is exciting box fill at garage, electrical conduit at kitchen outside of wall, secondary drain must be properly sloped. STOPPED INSPECTION MORE ITEMS MAY BE ADDED
9/4/24: seal all penetrations through vapor barrier, circuits tied in at bedroom and hallway, smoke detector must be 3' from bathroom opening, thermostat shall be no higher than 54" above finish floor,

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1223-01903
Permit Description: SFR K35D T21-M0032
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/03/2024 COT - RSPL - Yard Water Line Passed 7/3/24: MWL under air pressure test ok to backfill. Shading required
07/09/2024 COT - RSPL - Sewer Passed 7/3/24: not ready
7/5/24: test stack must be 5' in height. Must be filled completely.
7/9/24: corrections made ok to backfill. Shading required
07/09/2024 COT - RSPL - Rough Soil Passed 7/3/24: not ready
7/5/24: test stack must be 5' in height. Must be filled completely.
7/9/24: corrections made ok to backfill. Shading required
07/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/15/2024 COT - RSBU - Preslab Passed
07/15/2024 COT - RSEL - Electrical Underground Passed
08/06/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/06/2024 COT - RSBU - Roof Nailing Passed
09/03/2024 COT - RSEL - Grounding/Bonding Passed
09/03/2024 COT - RSPL - Gas Pressure Test Passed
09/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/3/24: fire blocking required at garage by main panel, exterior light fixture is exciting box fill at garage, electrical conduit at kitchen outside of wall, secondary drain must be properly sloped. STOPPED INSPECTION MORE ITEMS MAY BE ADDED
9/4/24: seal all penetrations through vapor barrier, circuits tied in at bedroom and hallway, smoke detector must be 3' from bathroom opening, thermostat shall be no higher than 54" above finish floor,
9/5/24: corrections made.
09/05/2024 BULD - Electrical Clearance Passed 9/5/24: ECO TEP clearance
09/17/2024 COT - RSBU - Interior Shear Bracing Passed
10/30/2024 COT - BULD - SWG Clearance Passed
11/18/2024 COT - RSEL - Electrical Final Passed
11/18/2024 COT - RSEL - Outdoor Lighting Passed
11/18/2024 COT - RSME - Mechanical Final Passed
11/18/2024 COT - RSPL - Plumbing Final Passed
11/18/2024 ENGR Engineering Final Passed
11/18/2024 RSBU - Building Final Passed
11/18/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-06-04_V1.PDF DOCUMENTS VIEW