Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
09/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 9/3/24: fire blocking required at garage by main panel, exterior light fixture is exciting box fill at garage, electrical conduit at kitchen outside of wall, secondary drain must be properly sloped. STOPPED INSPECTION MORE ITEMS MAY BE ADDED
09/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 9/3/24: fire blocking required at garage by main panel, exterior light fixture is exciting box fill at garage, electrical conduit at kitchen outside of wall, secondary drain must be properly sloped. STOPPED INSPECTION MORE ITEMS MAY BE ADDED
9/4/24: seal all penetrations through vapor barrier, circuits tied in at bedroom and hallway, smoke detector must be 3' from bathroom opening, thermostat shall be no higher than 54" above finish floor,
09/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/3/24: fire blocking required at garage by main panel, exterior light fixture is exciting box fill at garage, electrical conduit at kitchen outside of wall, secondary drain must be properly sloped. STOPPED INSPECTION MORE ITEMS MAY BE ADDED
9/4/24: seal all penetrations through vapor barrier, circuits tied in at bedroom and hallway, smoke detector must be 3' from bathroom opening, thermostat shall be no higher than 54" above finish floor,
9/5/24: corrections made.