Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 9/3/24: fire blocking required at garage by main panel, exterior light fixture is exciting box fill at garage, electrical conduit at kitchen outside of wall, secondary drain must be properly sloped. STOPPED INSPECTION MORE ITEMS MAY BE ADDED | |
| 09/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 9/3/24: fire blocking required at garage by main panel, exterior light fixture is exciting box fill at garage, electrical conduit at kitchen outside of wall, secondary drain must be properly sloped. STOPPED INSPECTION MORE ITEMS MAY BE ADDED 9/4/24: seal all penetrations through vapor barrier, circuits tied in at bedroom and hallway, smoke detector must be 3' from bathroom opening, thermostat shall be no higher than 54" above finish floor, |
|
| 09/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/3/24: fire blocking required at garage by main panel, exterior light fixture is exciting box fill at garage, electrical conduit at kitchen outside of wall, secondary drain must be properly sloped. STOPPED INSPECTION MORE ITEMS MAY BE ADDED 9/4/24: seal all penetrations through vapor barrier, circuits tied in at bedroom and hallway, smoke detector must be 3' from bathroom opening, thermostat shall be no higher than 54" above finish floor, 9/5/24: corrections made. |