Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
5206 E CARAMBOLA CT
Apply Date:
04/10/2024
Applicant:
Description:
VC 1262-130

Permit Reviews

Permit Number - TC-MDP-1223-01899
Permit Status: Inspections complete
Permit Description: VC 1262-130
Start Date Submittal Complete Date Status  
04/12/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1223-01899
Permit Status: Inspections complete
Permit Description: VC 1262-130
Total Outstanding Activity Conditions - 7
Date Name
04/03/2023 Post-Tension Inspection Report is required.
04/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
04/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/15/2024 Post-Tension Inspection Report is required.
04/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1223-01899
Permit Status: Inspections complete
Permit Description: VC 1262-130
Date Description Comments
04/18/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1223-01899
Permit Description: VC 1262-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/07/2024 COT - RSPL - Rough Soil Passed
05/08/2024 COT - RSPL - Sewer Passed
05/08/2024 COT - RSPL - Yard Water Line Passed
05/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/20/2024 COT - RSBU - Preslab Passed
05/20/2024 COT - RSEL - Electrical Underground Passed
05/20/2024 COT - RSEL - Grounding/Bonding Passed
05/29/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/29/2024 COT - RSBU - Roof Nailing Passed
06/18/2024 COT - RSPL - Gas Pressure Test Passed
06/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/26/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 6/26/2024
06/27/2024 COT - RSBU - Interior Shear Bracing Passed
08/01/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/1/2024
08/26/2024 COT - RSEL - Outdoor Lighting Passed
08/26/2024 COT - RSME - Mechanical Final Passed
08/26/2024 RSBU - Building Progress Passed
08/27/2024 COT - RSEL - Electrical Final Passed 8/27/2024 corrections have been made
08/27/2024 COT - RSPL - Plumbing Final Passed 8/27/2024 corrections have been made
08/27/2024 RSBU - Building Final Passed 8/27/2024 corrections have been made
08/28/2024 ENGR Engineering Final Passed