Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
12/07/2022
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55M T21-M0089

Permit Reviews

Permit Number - TC-MDP-1222-00172
Permit Status: Complete
Permit Description: SFR RKF55M T21-M0089
Start Date Submittal Complete Date Status  
12/22/2022 RESIDENTIAL NEW DWELLING v.1 01/04/2023 REQUIRES RESUBMIT Review Details
01/10/2023 RESIDENTIAL NEW DWELLING v.2 01/20/2023 APPROVED Review Details
09/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1222-00172
Permit Status: Complete
Permit Description: SFR RKF55M T21-M0089
Date Description Comments
02/21/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/27/2023 ISSUED WITH PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P21SD0033 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ
02/21/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/21/2024 Post-Tension Inspection Report is required.
09/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/21/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1222-00172
Permit Description: SFR RKF55M T21-M0089
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/25/2023 COT - RSPL - Sewer Passed
01/25/2023 COT - RSPL - Yard Water Line Passed
01/25/2023 COT - RSPL - Rough Soil Passed
02/08/2023 COT - RSEL - Grounding/Bonding Passed excavation rebar zoning, pre slab and electrical underground pass. don’t have option to add these inspections to permit
03/21/2023 COT - RSBU - Roof Nailing Passed
03/27/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/05/2023 COT - RSBU - Interior Shear Bracing Passed
07/18/2023 BULD - Electrical Clearance Passed
09/07/2023 COT - RSPL - Gas Final Passed
09/07/2023 COT - BULD - SWG Clearance Passed
11/27/2023 COT - FCON - Sprinkler - Final Passed
11/27/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/27/2023 COT - RSBU - Preslab Passed
11/27/2023 COT - RSEL - Electrical Final Passed
11/27/2023 COT - RSEL - Outdoor Lighting Passed
11/27/2023 COT - RSEL - Electrical Underground Passed
11/27/2023 COT - RSPL - Gas Pressure Test Passed
11/27/2023 COT - RSPL - Plumbing Final Passed
11/27/2023 COT - RSME - Mechanical Final Passed
11/28/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
220365 - RINCON KNOLLS LOT 280 - PT REPORT-2024-02-16_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-1_SITE PLAN_V2_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V2.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2022-12-20_V1-2022-12-22_V1.PDF DOCUMENTS VIEW