Permit: TC-MDP-1125-00736
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6240 S SPRUCE GOOSE AV
Address NEW:
6240 S SPRUCE GOOSE AV
Apply Date:
11/26/2025
Applicant:
Celina Rodriguez
Description:
Cielo Reserves 850-125 (Model Master Plan #TC-MDP-0925-00574)
Permit Reviews
Permit Number - TC-MDP-1125-00736
Permit Status: Inspections complete
Permit Description: Cielo Reserves 850-125 (Model Master Plan #TC-MDP-0925-00574)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/30/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 12/30/2025 | APPROVED |
| 11/28/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 12/09/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1125-00736
Permit Status: Inspections complete
Permit Description: Cielo Reserves 850-125 (Model Master Plan #TC-MDP-0925-00574)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 11/21/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 11/21/2025 | Post-Tension Inspection Report is required. |
| 11/21/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-1125-00736
Permit Status: Inspections complete
Permit Description: Cielo Reserves 850-125 (Model Master Plan #TC-MDP-0925-00574)
| Date | Description | Comments |
|---|---|---|
| 11/21/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/21/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1125-00736
Permite Description: Cielo Reserves 850-125 (Model Master Plan #TC-MDP-0925-00574)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1125-00736
Permit Description: Cielo Reserves 850-125 (Model Master Plan #TC-MDP-0925-00574)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | COT - RSPL - Sewer | Passed | 01/09/2026 Holding under test with green tracer to HCS - ok to backfill with shading material. |
|
| 01/09/2026 | COT - RSPL - Rough Soil | Passed | 01/09/2026 All fixtures present & under test - ok to backfill with shading material. |
|
| 01/09/2026 | COT - RSPL - Yard Water Line | Passed | 01/09/2026 Holding under test with blue tracer to meter - ok to backfill with shading material. |
|
| 01/15/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 01/15/2026 Approved per site plan. |
|
| 01/15/2026 | COT - RSBU - Preslab | Passed | 01/15/2026 Approved per plan. Okay for concrete placement. |
|
| 01/22/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1.22.26 Approved, proceed |
|
| 01/22/2026 | COT - RSBU - Roof Nailing | Passed | 1.22.26 Approved, proceed |
|
| 02/02/2026 | BULD - Electrical Clearance | Passed | Clearance to TEP ECO. 2/1/2026 | |
| 02/05/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2.5.26 Approved |
|
| 02/05/2026 | COT - RSPL - Gas Pressure Test | Passed | 2.5.26 Approved |
|
| 02/05/2026 | RSBU - Building Progress | Passed | ||
| 02/18/2026 | COT - RSBU - Interior Shear Bracing | Passed | 2.18.26 | |
| 03/23/2026 | COT - BULD - SWG Clearance | Passed | 3.23.26 Approved for SWG clearance |
|
| 03/27/2026 | ENGR Engineering Final | Passed | ||
| 04/02/2026 | COT - RSEL - Electrical Final | Passed | 4.2.26 Approved |
|
| 04/02/2026 | COT - RSEL - Outdoor Lighting | Passed | 4.2.26 Approved |
|
| 04/02/2026 | COT - RSME - Mechanical Final | Passed | ||
| 04/02/2026 | COT - RSPL - Plumbing Final | Passed | 4.2.26 Approved |
|
| 04/02/2026 | RSBU - Building Final | Passed | 4.2.26 Approved |